Free · No signup · Updated daily
In Brief
Secures contract worth ₹5,400 crore to manufacture high-speed trainsets for India's bullet train corridor.
Public sector enterprise BEML Limited (formerly Bharat Earth Movers Limited) secured a major commercial contract worth ₹5,400 crore for the indigenous design, development, and manufacturing of high-speed trainsets for the Mumbai-Ahmedabad High-Speed Rail (MAHSR) corridor, popularly known as India's first bullet train project.
Executed by the National High Speed Rail Corporation Limited (NHSRCL), the 508-kilometer Mumbai-Ahmedabad bullet train corridor utilizes Japanese Shinkansen technology under a bilateral financial and technical partnership. The involvement of domestic manufacturers like BEML marks a decisive shift toward indigenizing high-speed rail technology under the Make in India initiative.
The ₹5,400 crore order involves constructing multi-car trainsets capable of operating at test speeds exceeding 280 to 320 kilometers per hour. BEML will manufacture the rolling stock at its Bengaluru complex, utilizing advanced lightweight aluminum body construction and state-of-the-art energy recovery braking systems tailored for high-speed corridor operations.
For competitive exams like UPSC, Railways (RRB NTPC/NTE), and Banking, this contract serves as a classic question source. Aspirants should memorize key metrics: 508 km MAHSR corridor, NHSRCL role, BEML's PSU status under Ministry of Defence, Shinkansen technology partnership, and public expenditure allocations for national rail infrastructure modernization projects.
Maldives Repays $150 Million Treasury Bill Loan to State Bank of India
19 Sep 2026
India Secures 2.8 Million Tonne Duty-Free Steel Export Quota from EU
18 Sep 2026
PM Modi Pitches India as Trustworthy Chip Hub at Semicon India 2026
18 Sep 2026
Supreme Court Petition Challenges New 0.4% UPI MDR Fee On Large Transfers
17 Sep 2026